Best Practices for Cost Control in Building Construction Project Management: A New Path to Budget Optimization in the Age of Intelligence


In today’s increasingly competitive construction industry, building construction project management has evolved far beyond a purely technical process. It now stands at the core of a company’s profitability and long-term viability. Particularly in the realm of cost control, traditional experience-based models struggle to keep pace with the complexity and financial pressures of modern projects. Achieving precise, measurable, and predictive cost management has become a strategic priority for builders and developers alike.

According to a McKinsey study, nearly 85% of global construction projects experience cost overruns, with an average overspend of 28%. In China, despite tighter regulatory oversight and growing market transparency, many construction firms still face persistent “uncontrollable risks” during cost control. This challenge is especially pronounced in large-scale public infrastructure, prefabricated building systems, and green construction, where technical complexity and multi-tiered supply chains leave little room for error. A misstep in any single process can ripple across the entire budget.

Consequently, construction cost management is undergoing a paradigm shift—from reactive measures to proactive optimization. More firms are adopting cost modeling at the design stage and leveraging Building Information Modeling (BIM) for full lifecycle budget forecasting. BIM is more than a 3D modeling tool; its real value lies in data integration and dynamic coordination. When linked with procurement platforms, construction schedules, and labor management systems, BIM empowers teams to adjust cost strategies in real time—avoiding costly surprises and inefficiencies.

A high-rise project in Shenzhen exemplifies this shift. The developer, in partnership with the general contractor, implemented an AI-driven dynamic budgeting system. By analyzing daily material usage, equipment productivity, and labor expenses—and comparing them to historical project data—the system issued early warnings on potential budget deviations. The project’s original budget stood at RMB 2.8 billion; the final cost was RMB 2.73 billion—a 2.5% savings—and the project finished 17 days ahead of schedule. This case highlights how technology is not only enabling cost control, but also reinforcing the principles of lean construction.

Another emerging tactic in budget optimization is rethinking contract structures. Increasingly, owners are adopting target cost contracts or gain-share/loss-share models, aligning profits with cost performance across all stakeholders—from contractors to designers and suppliers. This alignment fosters a collective drive toward efficiency. For instance, in a Nanjing metro project, the general contractor and design firm entered into a floating-incentive agreement that rewarded design revisions reducing budget without compromising safety or function. The team optimized 14 structural nodes, cutting costs by a significant margin.

Green building standards and carbon emission targets are also reshaping cost control strategies. Material choices, energy-efficient designs, and low-carbon construction methods are now critical budget variables. The industry is gradually embracing a total-cost perspective, evaluating not only upfront construction costs, but also energy consumption over time, maintenance expenses, and eventual asset recovery value. This broader lens shifts the conversation from “how much does it cost to build” to “how much value does it generate,” sparking a more sustainable and long-term financial outlook.

Experts note that future-ready building construction project management must lean heavily into data-driven decision-making and cross-functional collaboration. Cost control is no longer the sole responsibility of the finance team—it’s a strategic concern shared by design, procurement, engineering, and IT departments alike.

In conclusion, in an era marked by high land prices and rising capital costs, even a 1% improvement in budget accuracy can translate into tens of millions saved over a project’s lifecycle. For construction firms aiming for sustainable growth, investing in advanced cost control systems and budget optimization capabilities may prove more decisive than simply winning the next contract.